The park’s permitted generation capacity is 40 megawatts (MW), installed capacity – 50 MW.
“The park has started generating its first electricity. At the same time, this shows that despite the large development of renewable resources, we are still ready to integrate new renewable energy production capacities with developers,” said Ignas Mickevičius, acting head of the Litgrid Renewable Resources Center, in a statement.